Project Development of 100MW hybrid projects for China Three Georgeos Group over existing land. The sponsor company has got the LOI from AEDB in effort to increase the overall plant utilization capacity of the 3*50 MW Wind Farms that are TGF, TGS & TGT
The development of a 15 MW Solar PV and Grid Power Hybrid Project in Mirpur, Azad Jammu & Kashmir, Pakistan is underway at the site of the 84 MW New Bong Escape Hydropower Plant, with the aim of increasing the overall utilization capacity of the Hydropower plant.
Project Development of up to 50 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at the land of 50MW Master Wind Power Project. The sponsor company has got the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW Wind Farm.
Project Development of up to 50 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at the land of 50MW Zorlu Wind Power Project. The sponsor company has got the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW Wind Farm.
Project Development of up to 50 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at the buffer land of 50MW Gul Ahmed Wind Power Project. The sponsor company has got the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW Wind Farm.
RE2 has just signed the portfolio of total 400 MW Solar PV Project in Sindh sponsored by CTGSAIL. The project is at initial stages of development. At this time the Land assessments in Southern part of Pakistan, which have now been converted to Hybrid Projects.
Project Development of up to 50 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at near 50MW Metro wind power project. The sponsor has received the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW wind farm.
Project Development of up to 50 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at near 50MW Yunus wind power project. The sponsor has received the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW wind farm.
Project Development of up to 25 MW Solar PV Grid Power Hybrid Project in Jhimpir -Sindh, Pakistan is in process at near 50MW Hartford Alternate Energy Wind Power Project. The sponsor has received the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW wind farm
Project Development of up to 50 MW Solar PV Hybrid Grid Power Project in Jhimpir -Sindh, Pakistan is in process at near 50MW Metro wind power project. The sponsor has received the LOI from AEDB in effort to increase the overall plant utilization capacity of the 50 MW wind farm.
Amreli Steels Ltd. intended to install upto 80 MW of solar and wind hybrid system for their steel manufacturing plant located in Karachi. The RE2 is providing complete technical services for the development of bankable feasibility study and supervision services during construction phase. The project is under development and expected to be completed by 2023.