Details of Completed Biomass Projects

PROMOTING SUSTAINABLE ENERGY PRODUCTION AND USE OF BIOMASS IN PAKISTAN – A PROJECT OF WINROCK / UNIDO.

During this project, various biomass resources were analyzed and validated for possible technological options for making sustainable use of existing biomass resources. The major output of the project was the development of three pre-feasibilities for pilot projects, two for SMEs and one for village electrification was designed considering inter alia costs, associated income generation activities, co-financing, GHG emissions reduction, monitoring and evaluation plans.

15 MW HIGH PRESSURE BAGGASE BASED POWER GENERATION PROJECT OF HAMZA SUGAR MILLS LIMITED

Hamza Sugar Mills Limited got an LOI for the development of 15 MW high pressure based power generation Project at Jhetta Bhutta Khanpur, District Rahimyar Khan. RE2 supported the project for the development of the Project including Initial Environmental Examination and the EPA.

120 MW BIOMASS POWER PROJECT OF FATIMA ENERGY LIMITED

RE2 is the Lender’s Engineer for Fatima Energy 120 MW Biomass Project at Mehmoodkot Muzaffargarh in partnership with Lahmeyer International. Lender’s Engineer services are being provided to Habib Bank Limited of Pakistan.

The project is located beside an existing sugar mill belonging to Fatima Sugar Mills Ltd (FMSL), the Sponsor. The power plant will mainly utilize bagasse produced by the sugar mill as fuel during the 4 months of cane crushing season and will burn imported coal at all other times.